Integrated lithium battery energy storage solutions
CERTIFICATIONS & COMPLIANCE

For every applicable requirement,
find the matching product boundary and manufacturing evidence

Compliance is not a certificate added at project end—it is an engineering chain maintained from product boundary, design input, manufacturing control, and test validation through factory evidence and site applicability. Every requirement must answer: where it applies, who controls it, how it is verified, and where the evidence lives.

Requirement → Boundary → Control → Evidence → Certificate → Project Release
Generic Model Test Report TC-OCC-ESS-MR-R03-2025 Rev 2.1
• Effective / Current
Test report TC-TR-ESS-R03-2025 Rev 1.6
• Effective / Current
Statement of conformity TC-DOC-ESS-R03-2025 Rev 1.3
• Effective / Current
Certification & Compliance Matrix · ESS-5M-R03
Requirement D M T C Status
IEC 62619 Cell Safety
IEC 63056 ESS
UL 9540
NFPA 855
GB/T 36276
Project Grid Code
Applicable standard 12
Mapd Requests 186 / 186
Subject of evidence 248
Approved / Current valid 244
Item-specific to enter 4
Manufacturing evidence closed. 146 / 146
Key compliance gaps 0

First define the boundary, then determine whether the requirement applies

1
Cell / Module / Pack Core / Model / Battery Pack
2
Rack High pressure frame boundary
3
Complete BESS System Complete Service Systems
4
Manufacturing & Factory Manufacturing and plant
5
Project Installation / Site Project installation/ site
6
Grid Interface Network interface
Cell / Module / Pack: Covers the core, the module, the electrical safety of Pack, mechanical safety, heat outage and single-body test evidence.

In the same system, access to different markets requires a re-identification of applicable conditions

Country / Regional applicability

Target market Authenticated Pending item input

Chain of application

Country/ Region

North America
Europe
Australia
China
Middle East

Electricity / Regulatory Conditions

Grid-connection voltage
Protection requirements
Harmonic Limit
Fire code
Building codes

Product Configuration

ESS-5M-R03
HW R03
SW v2.3.7
PCS 1.25MW
15 Rack

Climate/ Environment

Temperature
Altitude
Corrosion level
Wind / Snow
Earthquake

AHJ / Project Requirements

Safe distance
Fire fighting.
Field tests
Operating licences
Local Witness
The “certified” in a single market does not automatically mean that any project can be used directly, and the project still needs to be reconfirmed in combination with on-site conditions, grid specifications and AHJ requirements.

Compliance is not a list, but a traceable chain of evidence. Map Completion 186 / 186

Standard / Requirements Design control Manufacturing control Verify / Test Subject of evidence Status
IEC 62619:2022 BMS / Cell Safety FMEA Key IQC / Pack assembly Electrical security / temperature / failure TR-250218 / FAT EVIDENCE AVAILABLE
IEC 63056:2020 System Safety Analysis BMS / Rack Control System protection / trouble testing TR-250221 EVIDENCE AVAILABLE
IEC 62477-1 PCS Insulation / Clearance PCS manufacturing inspection Insulation / Pressure Resilient / PE Continuous TR-250128 EVIDENCE AVAILABLE
UL 9540 System Architecture Configuration Control System Test UL Listing File THIRD-PARTY REVIEW
NFPA 855 Fire Safety Design Fire System Assembly Site / AHJ Verification Project Fire Package PROJECT-SPECIFIC
GB/T 36276 Cell / Module / Rack Production Control Performance / Safety CN Test Report EVIDENCE AVAILABLE
APPLICABLE EVIDENCE AVAILABLE THIRD-PARTY REVIEW PROJECT-SPECIFIC NOT APPLICABLE
IEC 62619:2022: Industrial lithium-battery safety requirements are mapped to BMS safety design, manufacturing checks, pack/rack safety tests, and type-test evidence.

Matrix of standards and requirements Products, systems, installations, grids and regional requirements

Select any standard card to see the applicability boundary of that requirement for the current product and project.

Certificates and declarations must be subject to the scope of application, model and version baseline

Certificate & Declarant Account

Document Number File Type Applicable products Accreditation body Publication date Active Status
TC-OCC-ESS-5M-R03-2025 Statement of conformity ESS-5M-R03 TIANCHU 2025-05-12 Current
TC-TR-ESS-5M-R03-2025 Type test report ESS-5M-R03 Third Party Lab 2025-05-10 Current
TC-UL-9540-ESS-R03 UL 9540 Certificate ESS-5M-R03 NRTL 2025-05-01 Current
TC-IEC62619-BATT-R03 IEC 62619 Battery System Accredited Lab 2025-04-26 Current
TC-CAL-146-146 Producing evidence Factory TIANCHU 2025-05-11 146/146

Plant compliance closed loop: from system to equipment, from process to record

System Certification ISO 9001/ Quality System/ Program File
Test equipment 146 / 146 Effective calibration status
Process control Process, BOM, configuration, all controlled
Personnel Trading and Authorization Job capacity, qualifications, authorization records
Inadequate and corrective prevention Full NCR / CAPA / ECR closed loop

Compliance must be updated as products and projects change

1 BOM / Key Change Supplier / Material / Cell / PCS
CURRENT
2 Software and control changes BMS / EMS / PCS Firmware
CURRENT
3 Design impact analysis RTM / Safety / Certification
REVIEWED
4 Validation and Retrometry Regression / Partial Retest
VERIFIED
5 Certificate impact judgement Re-certification / Report Update
CONTROLLED
6 Release of new baselines Product / Project Compliance Baseline
APPROVED
Project installation distance Local fire code / AHJ confirmed
● PROJECT-SPECIFIC
Local networking regulation Grid Code / Protection
● PENDING INPUT
Environmental conditions Altitude / Corrosion / Seismic
● PROJECT-SPECIFIC
Fire clearance AHJ / Fire Department
● PENDING INPUT

Interface and bias governance

Key compliance gaps 0
Item-specific inputs 4
Significant open deviation 0
Numbering Category Problem / Input Head Target Status Status
RFI-001 Item Input Fire safety distance on site Project engineering AHJ confirms. PENDING INPUT
RFI-002 Networking Local Grid Code version Electrical Engineering Regulating Freezing PENDING INPUT
RFI-003 Environment Project Altitude / Corrosion Level Project engineering Project conditions recognized PENDING INPUT
RFI-004 AHJ Field fire clearance requirements Project engineering Authorize Inputs PENDING INPUT

Third-party and regulatory trust degrees Security clearance, no approval

✓ Clear product boundary and scope of application Ready
✓ RTM requests complete matrix Ready
✓ Test evidence is traceable. Ready
✓ Plant records match product identity Ready
✓ Change impact analysis complete Ongoing
✓ Project-specific inputs are managed separately Ready

Project compliance pack: prepare for project review and filing

Product and project boundary

General product certification
IEC / UL / GB
RTM Authentication Matrix
Requirement Traceability
Project site input
Site / AHJ / Grid
Change and deviation
ECR / NCR / RFI

Project compliance delivery

RTM Requesting Back Matrix 186 / 186
CERT Certificates and reports Current Set
DoC Statement of conformity Declaration
TEST Validation of evidence 248 Objects
FAC Plant evidence 146 / 146
RFI Item-specific inputs 4 Open Inputs
AHJ AHJ kit Site Specific
GRID Connect information Grid Package
REV Change and release records Baseline

Final release of baseline status

Current Configuration

Products ESS-5M-R03
Hardware HW R03
Software Baseline v2.3.7

Organisation

Subject of evidence approved 244
Item-specific inputs 4
Key compliance gaps 0
Baseline version Publication date Scope of change Status
v2.3.7 2025-05-12 Current product certification and evidence baseline Current
v2.3.6 2025-04-20 BMS / PCS software update Archived
v2.3.5 2025-03-15 Fire and environment validation update Archived