Integrated lithium battery energy storage solutions
Map of commercial storage capacity and demand control landscape

Commercial & Industrial Energy Storage

Let the reserves follow the pace of business, lower peaks and retain critical power.

Based on business plans and load targets, demand control, arbitrage, photovoltaic and critical load security are integrated into the movement control, while reducing the cost of energy utilization while retaining the necessary emergency capacity and operational flexibility.

Yes
Demand peak-shaving control Following changes in operating loads, proactively control peak requirements.
Price
Optimization of the cost of electricity Low-charge high-allocation and arbitrage in conjunction with the price of electricity in Peak Valley.
Paul.
Critical load security Retain emergency SOC and back-up power to balance reliability.
Sector
Multi-user and campus extensions Support for multi-building, multi-counting and multi-energy units.

Electrical integration and energy flow

Network / Substation 10kV / 0.4kV
Transformer 1,600 kVA
Main distribution cabinet Main Switchboard
Measures Revenue Meter
Energy Storage Systems PCS + BESS
Rooflight. PV
EMS Energy controller
Building load
HVAC / Light
Production load
Device / Elevator
Critical load
IT / Fire / Security

Repository movement driven by business week Example:

Business status Monday. Tuesday Wednesday Thursday Friday Saturday Sunday
Office building occupancy
Shops are open
Ventilation and air conditioning
Storage operations
Special activities
Projected requirements

Power determines the ability to peak, energy determines the duration.

Contract / Target Quantity 08:00 12:00 18:00
Power (kW) To decide on the possibility of pressing the load at short notice below the target requirement at peak times.
Energy (kwh) Determine how long it can last and how much emergency capacity needs to be retained.

Load and electricity characterization Example:

15-minute quantum curve

Maximum monthly requirement

Maximum requirements for the month 1,256 kW
Maximum requirement last month 1,281 kW

Electricity price structure (TOU)

Period Time Electricity
Peak11:00–14:001.298
Peak14:00–17:001.068
Square17:00–22:000.688
Low Valley23:00–07:000.368

Photovoltaic power generation

Electricity generation 1,842 kWh
Peak 412 kW

Percentage of sub-needs

Office building 500 432 39.8%
Retail B 300 276 25.4%
Storage C 250 214 19.7%
Device D 250 146 15.1%

Power factor and failure

PF 0.95
No merit 102 kvar

Energy Storage Systems State

SOC 72%
Power 164 kW
Electricity 764 V
Temperature 28.6 °C
Status Running

Four-value paths, one map to make a decision.

1 15 minutes to control.
Application: commercial parks with requirements close to contract ceilings
2 Peak Valley electricity price optimization
Application: Price differentials are significant and load patterns are stable
3 Photovoltaic Absorption
Application: Large light-voltage, self-use requirements High
4 Critical load protection
Application: Optical or storage capacity to cover back-up needs at the same time

Key decision-making variables in the integrated plan

Yes Required Quantification Target / contract /
Price Electricity price constraints Peak / Peak / Flat / Valley
Ji. Storage constraints SOC/ Power/ Cycle Number
Paul. Critical load constraints Minimum guaranteed capacity / backup time
Light Optical limit Projected contribution / spontaneous self-use

Target requirement control Example:

Prior to projection

After projections

Control parameters

Target requirements 1,100 kW
SOC Reservations 30%
Maximum discharge 250 kW
Duration 60 min

Energy efficiency and operational indicators

The Peaking Event 28 times
Peak Reduction 97.6%
SOC Minimum 31%
Power Consistency ±1.0%

Critical load boundaries and retention strategies

Precedence retained

  • Security system / Fire system
  • Server / Network Device
  • Critical production equipment
  • Emergency lighting
  • Elevator and evacuation systems

Flexible dispatch

HVAC / Colder System General office load EV Charge Area Landscape lighting Non-core tenant load

ATS / Storage and Critical Load

Grid Connection Status
ATS
Critical load
Normal load
Energy

Retain Policy

Min SOC 30%
Maximum discharge power 250 kW
Standby time ≥2.0 h
Restore Window 60 min

When business plans change, the dispatch strategy has to be recalculated.

1 Inspection of incidents Business plan changes, weather changes, temporary activities, increased critical load.
2. Load and photovoltaic prediction Recalculates future loads, PV output and corresponding risk windows.
3 Optimization and binding generation New plan for combined electricity prices, SOC, requirements and spare capacity generation.
4 · Dispatch execution Release PCS charge power and regional targets.
5. Validation and duplication Continuous calibration and recording of peaks, earnings and SOC changes.
Basis for binding: Target Demand Curve / Electricity Structure / SOC Boundary / Cost and Benefit Assessment

Site engineering design and layout

1
2
3
4
Device Space ≥1.5 m
Fire access route ≥4.0 m
Maintain channel ≥1.5 m
Isolation distance By norm
Ingress protection IP54 / Outdoor
Extension Support modularization expansion

Multi-construction extension and measurement boundary

Single construction Single title / Single meter
→
Shared commercial courtrooms Public distribution/sharing measures
→
Multi-storey campus. Multi-tenant/ Partition Measurement

Measurement and validation M&V

Measuring links

Table Measures
PCS PCS
Ji. Batteries

Baseline and measured data

Indicators Baseline Actual Change
Maximum requirement 612,540 590,112 -14,428
Electricity cost 412,360 388,790 -23,570
Peak Valley Difference 321,760 300,120 -21,640

Monthly control indicators

The Peaking Event 28 times
Trigger success rate 97.6%
SOC Minimum 31%
Control consistency ±1.0%

Validate conclusion

✓ Authentication status: qualified

Capacity for full life cycle delivery

research Field research Load and electricity analysis
Yeah. Capacity measurement Power / Energy Match
Set System design Electrical and control design
Set Device integration PCS / BESS / EMS
Measure Joint inspection and inspection FAT / SAT / M&V
Transport Operational monitoring Peak / SOC / Proceeds
Yu Continuous optimization Policy & Arguments

NEXT STEP

Combining Boundaries and Delivery Paths around Commercial & Industrial Energy

Programme configuration and implementation tempo can be further confirmed on the basis of on-site loads, netting conditions, installed space and transportation requirements.