Integrated lithium battery energy storage solutions
Block 1 5.064MWh DC
PCS 1
Block 2 5.064MWh DC
PCS 2
Block 3 5.064MWh DC
PCS 3
Block 4 5.064MWh DC
PCS 4
GRID-SIDE ENERGY STORAGE PROJECTS

We'll organize a multi-storage block.
Portable, protected and accepted grid assets

From system design, equipment integration, debugging and networking to continuous operation, large-scale EnergyStorage Systems, with a real grid-friendly capability, is created by independent Block, unified dispatch, rapid protection and verifiable engineering evidence.

DEMO PROJECT

TC-DEMO-PROJ-GS-20256

20.256MWh / 5MW

4 x 5.064 MWh DC Block | 4 x 1.25 MW PCS (example)

01 Total site plane and system composition

  • Four stand-alone DC Blocks, stand-alone partitions, fire spacing and access.
  • Each Block Capacity 5.064MWh, single Block can be isolated.
  • Every Block Counterpart 1 1.25 MW PCS35 kV system.
  • Main change/ switchboard / PCCs constitute a unified net border.
  • Station control configuration EMS, metrology, protection, communication and event recording.
  • Fire, heat management and Block are separated into layers of security structures.
Block 1 5.064MWh DC Block 2 5.064MWh DC Block 3 5.064MWh DC Block 4 5.064MWh DC 35kV Switch Station / Main Change PCS 1 · 1.25MW PCS 2 · 1.25MW PCS 3 · 1.25MW PCS 4 · 1.25MW Station Control

02 Physical primary system chart SLD

Block 1 5.064MWh DC Block 2 5.064MWh DC Block 3 5.064MWh DC Block 4 5.064MWh DC PCS 1 PCS 2 PCS 3 PCS 4 35kV Compositing Master 35kV Turn off the locker. Main transformer 35kV / ... PCC Measurement cabinet Grid Connection Status 35kV Power loop. Control / Chain

03 · Dispatch and protection: two parallel lifelines

The dispatch chain determines "how to run" and the protection chain determines "how to determine, quickly and independently stop a dangerous state in the event of an anomaly".

Dispatch control link

AGC
AGC / AVC
EMS
EMS
PCS
PCS
DC
DC Block
  • AGC/AVC Target Delivery
  • EMS power allocation according to Block SOC and state
  • PCS Implementation of P/Q controls and feedback

Protect the link.

RELAY
Relay Protection
LOGIC
Protect Logic
TRIP
Emergency jump.
ISO
Isolation failure.
  • 35kV / PCS / Block Multilayer Protection
  • Hard-wire and GOOSE quick jump.
  • Fault protection independent of EMS dispatch chain
Dispatch control link: AGC/AVC power generation and powerlessness targets, EMS power allocation based on SOC, Block state and available capacity, PCS implementation completed and feedback on actual results.

04 Network performance Run Evidence

P-Q Capability Curve

Power response.

The ability to climb.

SOC Balance 4 Blocks

Electrical Quality THD

Availability Almost 30 days.

99.42% Availability

05 Block fault isolation scenario Single Block Exit

Normal (4 Block)

Block 1
Block 2
Block 3
Block 4
→

Available capacity: 20.256 MWh / 5 MW

Block 2

Block 1
Block 2
Fault
Block 3
Block 4
→

Protect movement, only block out Block.

Restructured System (3 Block)

Block 1
Isolated
Block 3
Block 4
→

EMS automatically reconfigures the movement control boundary to 3 healthy Blocks.

Downgrade running (3 Block)

Available capacity 15.192MWh
/ 3.75MW

The remaining Block continues to participate in peaking, FM and grid services.

06 Communications, time, security and incidents

LINK
Redundant communications Cross-channel / ring-net redundancy for critical operations
PTP
Time Sync GPS / Beidou + PTP, time accuracy ≤1 ms
CTRL
Control and Command EMS to PCS two-way monitoring, command and feedback
EVT
Event Record SOE, Protection Actions and Cross-Contact
SAFE
Fault protection Fault-off chain and running log layer maintained
Dispatch master station AGC / AVC Site Control EMS PCS Layer PCS 1 / 2 / 3 / 4 DC Block 1 / 2 / 3 / 4 Protect Layer Follow-up/ lockup

07 Delivery and construction processes The rhythm of important projects

1. Manufacturing
Batch manufacturing and out-of-plant testing
2. Transport presence
Heavy transport, batch arrival
3. Hanging in place
Large-scale suspension and base position.
Installation of connections
Straight flow / communication / communication / location
5. Phased power delivery
Zone electrocution, monolink.
Networking Try
Communication connection, performance validation
7. Networking
Official transport and stabilization observations

08 Receiving and inspection and performance verification Network acceptance path

1
A job test. Protection and equipment status
2
Protect fixed value authentication Fix and lock check
3
SCADA / Remote Telemetry, telecommunication, remote control.
4
AGC / AVC Dispatch control performance
5
Performance Validation Energy / Power / Efficiency
6
Closed. Run & Event Trace

09 Representative project: TC-DMO-PROJ-GS-20256

Project parameters

Type of project Grid-side energy storage
Access to voltage 35kV
Total capacity / total power 20.256MWh / 5MW
System configuration 4 × 5.064MWh DC Block
4 × 1.25MW PCS
Connect Point 35kV bus
Build Status DEMO. Run validation
Item number TC-DEMO-PROJ-GS-20256

Run Evidence

  • AGC Response to Schedule Requirements
  • P-Q capability meets operational boundaries
  • SOC Balance between Blocks
  • Availability of approximately 99.42 per cent for 30 days
  • The single Block failure is isolated.
  • You can downgrade and run as long as you're down.
Equipment functioning.
Station communication is normal.
Control links are clear.
Secure the chain.

10 Standardized results package for transfer of grid

SLD One system chart SLD / As-built
PRO Protect fixed values and logic Repossession configuration/ locking
TEST Test report FAT / SAT / Networking Test
COM Schedule interface files Table / Protocol / ICD
SOE Events and retrospective documents SOE / Alert / Operation Record
KPI Performance validation package Networking / KPI
Ultimate Principle: The grid side energy project is not a "mix of cabinets" but must be able to draw from Block → PCS → Collection Bus → Protection → EMS / AGC → PCC → Grid Establish a unified operational boundary and demonstrate that the system is in place Operating, single-block failure, protective action, downgrading and networking degrees There are clear and verifiable acts in each state.