Integrated lithium battery energy storage solutions
Electricity grid (10kV)
PCC Connect Point
Distribution grid 10kV / 0.4kV
BESS Energy Storage Systems
2.61MWh / 1.25MW
Fire escape 6m
Repair channel ≥ 1.2m
COMMERCIAL & INDUSTRIAL PROJECTS

On a constrained site,
Let Energy Storage Systems be real.
Production and energy boundary

(c) Tightly landed, controlled, operationally independent, engineeringly delivered, without disrupting core production operations, access to real park power distribution systems and the generation of verifiable project evidence.

Item number
TC-DEMO-PROJ-CI-2610 DEMO PROJECT
Storage capacity 2.61MWh
Rated power 1.25MW
Access to voltage 0.4kV
Status: Stable running (DEMO)

01 Combining Business DEMO PROJECT

Manufacturing parks DEMO

2.61MWh / 1.25MW

Two-/three-shift manufacturing loads; production cannot be interrupted.

Data-infrastructure parks DEMO

3.44MWh / 1.72MW

High-reliability loads with emphasis on backup and power continuity.

Commercial complexes DEMO

1.72MWh / 0.66MW

Commercial and office loads with clear intra-day peaks and valleys.

Logistics parks DEMO

2.00MWh / 1.00MW

Logistics and charging loads with high volatility.

Manufacturing park: A typical continuous production load, which can be used mainly for demand control, pebble arbitrage and the stabilization of production power supply.

02 Site and operational constraints matrix DEMO PROJECT

Planning elements Land use / layout Grid-connection constraints Grid-connection capacity Fire access route Construction window Load fluctuation Production continuity
Project requirements Compact site footprint
Do not influence the main channel.
Plant short-circuit capacity
≤ 65dB(A)
Point-of-connection capacity
≤ 2.0MVA
Fire access route
≥ 6m
Available outage windows
Six hours.
Intra-day fluctuation range
20%–100%
Production line
24/7 Run
Project achieved Land tenure approximately 260 m2
Avoiding Main Channels
Plant noise
≤ 58dB(A)
Access Capacity
1.25MW
Fire access route
6m achieved
Actual power outage window
4.2 hours
BESS Peak
Smooth Load
Production's not going on.
Phased Switch
Project requirements: The project must be implemented within the established production boundaries without altering the core logistics and fireways of the plant, while meeting the PCC capacity and production continuity requirements.

03 Physical structure comparison DEMO PROJECT

Integrated cabinet system (All-in-One) Application: Small business / Industrial
PCC
0.4kV
→
PCS + EMS
+ Battery integration
→
Load
  • Capacity range: about 255-465kWh
  • Land tenure: approximately 2-5 m2
  • Maintenance channel: ≥1.0m
  • Deployment speed.
2-4 container system Application: Small and medium-sized industrial parks
PCC
0.4kV
→
PCS / EMS
→
→
Load
  • Capacity range: approximately 500 kWh–2.5 MWh
  • Land tenure: 20-40 m2
  • Maintenance channel: ≥1.2m
  • It's easy to expand in stages.
10 Container system (using this project) Application: Large and medium industrial parks
PCC
0.4kV
→
PCS / EMS
→
→
Load
  • This item: 2.61 MWh / 1.25 MW
  • Land tenure: around 240-300 m2
  • Fire escape: 6 m
  • Repair channel: ≥1.2m
10 cabinet systems: The project is based on a 10-chamber distributed BESS, which meets the size of 2.1 MWh / 1.25 MW, with a combination of fire escape and post-maintenance.

04 Physical curve and storage tracking DEMO PROJECT

24h load curve

BESS Charge Power

BESS Schedule Effects

Critical load fluctuations 7.8%
Maximum charge power ±1.25MW
Response Time ≤ 250ms
Number of Day Cycles 0.82 times
Schedule satisfaction rate ≥ 95%

05 Project implementation and production boundary

Business projects must be established at the same time as production, safety, construction, networking and operation of multiple borders.

Production boundary

  • Production line 24/7 running
  • Real-time load fluctuations
  • Do not influence core processes

Operation scene

  • Vehicles, logistics, traffic diversion
  • Limited space for maintenance
  • Construction process subject to production

Permission and isolation

  • LOTO execution
  • HV/LV isolation
  • Mutual confirmation

Planned blackout window

  • Critical loads maintained.
  • Controlled power outage window
  • Actual 4.2 hours

Transfer test certificates

  • Control strategy alignment
  • Protection and communication authentication
  • Unusual Switch Exercise

Chart Status

  • Completion Map Update
  • Change record filing
  • Field configuration is consistent.

Safe return operation

  • System stable.
  • Security data is normal.
  • Formal handover on site

06 Installation of space and construction validation DEMO PROJECT

Hang and position.

(b) A self-contained vehicle, crane and personnel area of operation.

Foundations and sites

The concrete base and drainage conditions are reviewed and the ground load meets the equipment requirements.

Installation of cables

Cables and bridge paths are clear, critical width 600 mm.

Fire access route

Fire escape 6m, no conflict with production logistics routes.

Divisional isolation

Equipment partitions, distribution boundaries and repair isolation points are determined during the design phase.

07 Evidentiary chain of delivery DEMO PROJECT

FAT Out of the Plant

  • Functional test log
  • Protect lock records
  • Performance test records
  • FAT Report

Incoming inspection.

  • Check of arrival lists
  • Appearance and transport inspections
  • Key widget serial number
  • Check report

Installation of construction

  • Install Checksheets
  • Insulation and ground testing
  • Wire and sequence check
  • Construction records

Electron debugging

  • Single debugging records
  • Interlock test logs
  • Control input testing
  • Debug Report

SAT on-site inspection and acceptance

  • Performance Validation
  • Connect Response Validation
  • User confirmation records
  • SAT report

• Operational evidence DEMO PROJECT

The value of the project must fall on real operating data: whether movement control is implemented, loads are improved and equipment is stable.

Planned VS Real Power

Transformer / PCC Load Rate

Current 58% Top 78%

Battery cabinet temperature distribution

Maximum Temperature 30.2°C
Average temperature 24.6°C
Minimum temperature 6.6°C

System usability

99.2% Available
Run days 23 / 31

Close Ring / Operation Change

Total alarms 12
Active alarm. 0
Closed circle rate 100%
Maintenance worksheets 3
Configuration Changes 2
Current Version V1.3.2

09 Representative item: TC-DMO-PROJ-CI-2610 DEMO PROJECT

PROJECT OVERVIEW

Item number TC-DEMO-PROJ-CI-2610
Type of project Manufacturing & Industrial Energy Corporation
System Capacity / Power 2.61MWh / 1.25MW
System voltage 0.4kV
Connect Point PCC: 10kV / 0.4kV
Land area Approximately 260 m2
Time of shipment 2025-04-18
Run Status Stable running

Site Layout

Key constraints and realization

  • The total load is limited by the site ' s boundary and is set in 10 compact boxes.
  • Production is running at 24/7, with a phased replacement for construction.
  • The PCC network capacity is limited and can be used for peaking and demand control.
  • Fire escape 6m, where the area is separated from production logistics.
  • Maximum recharge capacity ± 1.25 MW.
  • BESS Effective dispatch satisfaction rate of 95 per cent.

System configuration

  • Battery cabinets: 10
  • PCS Box 1
  • EMS Box 1
  • Electric cabinets: 1 set
  • Fire protection systems: 1 set
  • Temperature control systems: 10

Scope of delivery

  • System design and integration
  • Equipment manufacturing and supply
  • Active & Commissioning
  • System connection and acceptance
  • Run Training

Switch and Access

  • Planned power outage window: 6 hours
  • Actual power outage: 4.2 hours
  • Switching step: 7 steps
  • Backpath: Complete
  • Delivery time: 2025-04-18

Current running evidence

  • Daily average data error: 0.82%
  • BESS schedule accuracy: good
  • System availability: 99.2 per cent
  • Unclosed loop alert: 0
  • Number of days running: 23/ 31

10 Transfer kit DEMO PROJECT

DES Completed drawings Electrical / Civil / Fire
CFG System configuration Device / Parameter / Version
FAT Test report FAT/ SAT/ Networking
OPS Operations Manual Daily / Transport / Bad
EVD Run Evidence Power / Warning / Trends
HAND Final handover Responsibility / Status / Signature
Definition of completion of business projects: Not "equipment has been put in the park," but... Site Boundary → Grid Constraint → Physical Architecture → Safe Construction → Controlled Cutover → SAT → Operating Evidence → Handover All are in place and the storage capacity is indeed capable of operating in a continuous, stable and verifiable manner under a real production load.