Bring operating evidence into the right reports and systems under the correct definitions
Real-time data, operational events and proof of overhaul linking large power storage plants, with clear ranges, uniform calibration and controlled distribution processes, generate reports and data deliverables for operations, assets, projects, technology and Systems Information.
Key indicators
Trends analysis
Event statistics
Structure distribution
01 Reporting system and upstream data sources
02 Range and caliber builders Scope Builder
03 Report assembly flow lines Process of generation of individual report packages
Raw data ingestion
- EMS / SCADA RAW
- BMS RAW
- Meter RAW
- Sheet / Event Record
Time Alignment / Quality Rules
- 15 min time film
- Missing detection
- Abnormal value recognition
- Quality Identification
Calculator Engine
- CALC-2024-05-01
- v1.2.0
- KPI Calculator
- Validation of caliber consistency
Evidence formulation/ assembly
- Trends
- Takuboshot
- Organisation
Technical review
- Engineer review
- Calculate Verification
- Coherence check
- Question amendment
Controlled release
- Approved version
- Publication of records
- Watermark
- Signature
Delivery channel
- PDF Report
- Data Files
- API
- Project package
04 Regular reporting and audience/access governance
| Report | Frequency | Trigger | Role | Scope | Delivery modalities | Reservations |
|---|---|---|---|---|---|---|
| Operating daily newspapers | 08:30 Daily | Run a duty group | Operation | Station | Mail/ System | 7 days |
| Businessweek | 09:00 a week | Operations Engineer | Operation | Station | Mail/ System | 30 days |
| Operation of monthly reports | 10 a.m. monthly | Asset owner | Management | Station | Mail/ System | 90 days |
| Quarterly Performance Report | Quarterly | Integrator | Item | Station | Mail/ System | 180 days |
| Annual compliance report | Year | Regulation / Compliance | Compliance | Full life cycle | System / API | 365 days |
05 High frequency-by-frequency reports Sync Time axis
06 Data Export and Large Data Volume Tasks CSV / Parquet / API/ Batg Export
07 Statements / Audit / Audit Tracking Reporting throughout the life cycle
| Version | Status | caliber version | Modify Summary | Generation time | Generator | Approving authority | Release time | Watermark | Operation |
|---|---|---|---|---|---|---|---|---|---|
| v0.1 | Draft | CALC-2024-05-01 v1.1.0 | Initial Generation | 2024-05-28 10:12 | Engineer A | — | — | DRAFT | Details |
| v0.2 | Reviewed | CALC-2024-05-01 v1.2.0 | Fix Missing, Chart Update | 2024-05-30 19:44 | Engineer B | Senior Engineer C | — | REVIEW | Details |
| v1.0 | Published | CALC-2024-05-01 v1.2.0 | Officially issued | 2024-06-02 10:00 | Engineer B | Senior Engineer C | 2024-06-02 10:02 | RELEASED | Details |
| v0.9 | Cancelled | CALC-2024-05-01 v1.1.0 | Alteration of calibre resulting in substitution | 2024-05-29 11:20 | Engineer A | — | — | SUPERSEDED | Details |
08 Controlled changes and re-issues Cases of change of calibre
09 Project package and delivery archive
Project delivery content
10 Border description
Analysis and validation done on professional analysis pages
This page does not redefine professional algorithms such as SOC, efficiency, performance, health, etc., but refers only to the results of the modulated analysis and computational evidence.
Report & Data Export = Delivery Layer
This page covers asset range, calibre, evidence assembly, release governance, document/API export and reporting life cycle.
Technical documents are centrally managed by the Document Centre
Product manuals, interface documents, design documents, programmes and long-term engineering documents, with the official version of governance performed by the Documentation Centre.