Integrated lithium battery energy storage solutions

Conversion of custom requirements into validated, transportable and interconnectable international BESS products

From Custom Requirements to Verifiable, Shippable, Handover-Ready International BESS
DEMO PROJECT
Client (anonymous) Anonymous Customer
Item number TC-DEMO-PROJ-OEM-5064
System Capacity 5.064 MWh
Status FACTORY RELEASED

01 Project overview

International Customized Storage Energy Project

The project is customized for overseas clients 5.064 MWh energy storage systems. System configuration, engineering validation, plant acceptance and international delivery, based on standard storage platforms and in accordance with target market regulations, networking requirements, transport conditions, customer interfaces and local language requirements.

APP
Application Scenarios Commercial storage / peak-valley arbitrage / grid support
GRID
Networking requests Offshore grid regulation and local connection
ENV
Environmental Conditions Medium pressure environment, outdoor installation, international transport
DOC
Scope of documentation PCS, BMS, EMS, Fire Protection, Debugging and Certification
FAT
Delivery status Plant acceptance completed and ready for international transport

Project highlights

100%
100% Customized design Client URLs and live conditions met
TEST
Full process verifiable From demand, work to FAT to form a chain of evidence
SHIP
Internationalized delivery capacity Packaging, transport, document synchronization design
HAND
Engineering delivery Transportable, debugable, hand-overable

System configuration

System Capacity 5.064MWh
Battery total pressure range 1126.4 – 1497.6Vdc
Communication side 10 / 20 / 33 kVac Configuration
System form 20FT HC Container
Ingress protection IP55
Working environment -30 – 50°C / C5-H

02 Customised Configuration Matrix Based on client input

CAP

Capacity Configuration

  • 5.064MWh
  • LFP core platform
  • Pack / rack standardization
  • N+1 Extended Reserve
DC

Direct current voltage platform

  • 1126.4 – 1497.6Vdc
  • 1500 V DC platform
  • PCS Window Match
  • Insulation.
CAB

Box and Structure

  • 20FT HC
  • IP55
  • C5-H preservation
  • Stations for international transport
GRID

Grid-connected interface

  • 10 / 20 / 33kVac
  • 50 / 60Hz
  • Locally configured
  • Protection interface definition
COM

Communication Protocols

  • Modbus TCP
  • IEC 104
  • BMS Agreements
  • VPN / Cybersecurity
OEM

Appearance Custom

  • Client brand
  • Colour / Paint
  • Security markings
  • Multilingual inscriptions
DOC

Languages and documents

  • Chinese/ English
  • Client specified language
  • User Manual
  • FAT / authentication information
Capacity configuration: Around the 5.064 MWh target capacity, define cell, pack, rack, and system configuration, and freeze the deliverable release configuration.

03 Configuration retroactive and change management

From client demand to finality, each change is sourced, evaluated and influenced.
01

Base Version

V0.1 Needs baseline established
02

Client review

V0.2 Client confirmation of demand
03

Project evaluation

V1.0 Internal engineering confirmation
04

Requests for change

CR-01 Structural and interface adjustments
05

Impact assessment

IR-01 Cost / surrender / Performance
06

External Configuration

RC-1.0 Controlled release
Basic V0.1 Client URLs, target market conditions, on-site interfaces and transport constraints entered the initial configuration baseline.

04 Project implementation and validation

01

Needs design and validation

System architecture, interfaces, parameters and validation programmes.

02

PCS / BMS / EMS Integrated Development

Protocol, logic, protection and unusual process development.

03

Target market assessment and issues closed

Closing of gaps in regulations, environment, certification and interfaces.

04

Testing and reliability evaluation

Process identification, assembly certification and reliability evaluation.

05

Batch production

Make and process tests according to the freeze configuration.

06

Plant acceptance FAT

Functions, performance, protection, communication and document acceptance.

Needs design and validation: Complete the decomposition of the need for system architecture, interfaces, parameters, functionality and target regulations to form a testable engineering option.
Thermal Simulation Authentication
Insulation resistance test.
Communications
Network Simulation Test
Charge/Discharge Testing Curve
FAT Report

05 Documents and Packaging

Multilingual Tags and Files

Platoon, security tags, manuals, drawings, FAT reports and authentication information are managed in tandem with the version in the specified language of the client.

Localize human interface

EMS / HMI harmonize interfaces, units, alarms and operating terms according to project language and customer operating requirements.

Protective Packaging and Maritime Transport

Designed and equipped with state monitoring for tidal, dust, seismic and long-term transport protection under international shipping conditions.

Provision for spare parts

Based on equipment BOM, operating risk and customer maintenance strategy, field spare parts, specialized tools and consumables are deployed.

International transport and delivery links

Following the release of the plant, packaging, suspension, port, sea transport, destination port and site handover remain part of the evidence of product delivery.
FAC

Plant

Production completed / internal inspection
PORT

Port

Export declaration/document identification
SEA

Transport

Maritime transport / status monitoring
DST

Port of destination

Unload / Customs clearance / status review
SITE

Destination

Delivery on site / Sign-in
Sub-packaging programme Naval transportation/ hanging / storage protection
Hanging and binding. Stations, angles and vehicle fixation
Earthquake prevention and monitoring Impact, tilt, humidity record
Routes and traceability Transport number and status tracking
Handover of documents PL / COC / QA / Transport Documents

07 Debug support and SAT readiness

Remote debugging support

VPN Remote access and diagnosis
CFG Parameter Configuration Support
ALM Alarm analysis and optimization
COM Communication and protocol alignment

Client, SAT readiness checklist.

✓ Equipment appearance and transport status confirmed
✓ Client cable and interface ready
✓ Base and location confirmation
✓ Network protection and rights confirmed
✓ Electrical insulation and ground inspection
✓ Functional test condition ready.
✓ Communications and network address configuration complete
✓ Confirm alarm and protection records
✓ EMS / BMS / PCS
✓ SAT Implementation Plan confirmed
SAT readiness 100%

On-site service readiness

BASE Configuration baseline Eventually
FAT FAT Evidence Package Plant acceptance evidence
DOC Document Package Manual / Drawing / Authentication
SHIP Transport evidence Packaging / monitoring / logistics
SAT SAT List On-site acceptance and acceptance readiness
HAND Project delivery package Final Handover Archive
Ultimate Principle: Internationally customized products must be able to Customer Requirement → Released Configuration → Verification → FAT → Packaging → Shipment → SAT Readiness → Handover The full chain is traced to ensure that each customization requirement eventually has a clear product configuration and verifiable evidence.