NON-CONFORMANCE CONTROL

Anomalies are not the real risk—
losing boundaries, evidence, and closure criteria
is the risk

Identify, isolate, disposition, verify, correct, and prevent recurrence. Lock the impact scope at the first moment of an anomaly, freeze logistics and digital workflows together, retain non-overwritable failure evidence, and close only with authorized decisions and verification.

Risk control before disposal; evidence before closure.
HOLD
Isolating
Spatial Impact Map 2025-06-18 10:24
Materials
Module
Rack
System
FAT
Shipment
1
2
3
4
5
X
SHIPMENT BLOCKED
Object PK-071
Affected 1 Pack
Downstream 0
Today's mass trigger 1
Key NCR open 0
Average block time 11 min
Overdue CR / CAPA 0
Evidence chain integrity rate 100%
Unauthorized downstream exposure 0

01 We'll lock the border and discuss the disposal.

Suspected object

Pack PK-071
ON HOLD

The module to which it belongs

Module M-24-11
FROZEN

Distribute Rack

Rack R-12
BLOCKED
SYSTEM ASSEMBLY" data-detail="The system SYS-03 was marked Allocation Denied and the anomaly was not accepted.">

SYSTEM ASSEMBLY

System SYS-03
DENIED

FAT Test

Factory Test
NO EXPOSURE

Delivery

Shipment
RELEASE BLOCKED
WMS inventory Frozen
MES Status On Hold
Worksheets/plugins No Slip
System distribution Allocation Denied
Delivery plan Shipment Blocked
Downstream exposure. 0
Suspected object: The anomaly first freezes the minimum identifiable object PK-071 and prohibits movement until its scope is confirmed.

02 Physical isolation and digital freezing take effect simultaneously.

HOLD
Isolating
!
Object ID PK-071
Status On Hold
Associated posts CELL-07
Impact Time 2025-05-18 10:22

MES Freeze

Worksheet Execution Block
Downstream collar. Block
Workspace flow Block
Process crossing. Block

WMS Freeze

Inventory status Freeze
Library request Block
Turn Library Block
Autoallocation Block

Mass Lock

Inspection records Association
NCR number Generated
Scope of impact Freezed
Responsible persons Confirmed

03 An unsatisfactory record must return to the subject, scope, evidence and responsibility

Object & Record

Object Type Pack
Object ID PK-071
Serial number SN310810071
First date 2025-05-04
Location CELL-07

Test Results

Feature Frozen pressure
Actual 1.42 kPa
Criteria for determination ≤1.00 kPa
Decision NG
Coldboard interface
O-Ring Seal
Pressure test point
Serial number/ ID

Test Method

Methodology Air leak test.
Method Number WI-QA-CP-014
Equipment DP-1000
Instrument Status The calibration works.
Uncertainty ±0.05 kPa

Responsibility and scope

Found someone. Quality tester
Responsible party Manufacturing works
Scope of impact Module / Rack / System
Evidence number EVD-250518-071
CUR Original Curve
RAW Original Data
LOG Equipment records
IMG Defective photos
VID Test Video
WI Operational guidance
CAL Calibration records

04 Case presentation: TC-DEMO-NR-2608-0059

Organisation

Object Pack PK-071
Abnormal description Frozen pressure deviation
Check Features Frozen pressure
Actual value 1.42 kPa
Criteria for determination ≤1.00 kPa
Initial results NG
Disposal status Pack isolation
Time of discovery 2025-05-18 10:18

Pressure - Time Curve

Test and Validation

Appearance
Gas supply system
Pressure measurement 1.42
Data acquisition interface

05 MRB disposal is not a list of options, but a decision-making mandate Field

Disposal results Conditions of application Risk level Authorized role Decision-making in this case
Give and take. Non-security key, client approval Low MRB Chair + Customer Not used
Return to work Recoverable to original technical requirements Low MRB Chair Adopt
Maintenance Deviation from original design but controlled risk Medium MRB Chair + Engineering Not used
Return goods Vendor / Not suitable for internal repairs Medium Supply chain manager Not used
End of life Security is critical and unrecoverable. High MRB Chair Permission granted
• Security requirements must not be circumvented by “conditions for release” “concessional acceptance”.
Return: By returning to the original design and technical requirements, O-Ring was replaced in this case and the test was retested as originally tested.

06 Case presentation supported by evidence

5-Why Analysis

1 Why did the stress test fail?
There was a leak in the O-Ring seal.
2 Why is O-Ring sealed?
After the assembly, there was a local squeeze in O-Ring.
3 Why is there a local squeeze?
• Lack of stable positioning structures for the clothing.
4 Why aren't the costumes located?
PFMEA did not identify the risk of the assembly.
5 Why is PFMEA not identified?
• New process experience did not feed back into the design rules.

Fish bone map

Man. Material Machine Machine Method Method Measurement Environment O-Ring The assembly's location is abnormal.

Evidence and authentication

Quantum system analysis MSCA
Interface surface check
Old O-Ring
New O-Ring Authentication

07 Correcting completion does not mean closure

Corrected Validation

Initial results 1.42 kPa
Repeated results 0.42 kPa
PASS . Meet ≤1.0 kPa

CAPA-0026 Measures to prevent recurrence

1 Modify O-Ring assembly SOP and positioning requirements.
2 Adding error-proof locator.
3 Update PFMEA and Control Plan.
4 100% visual confirmation after additional assembly.
5 34 Pack sample validation completed for new fit.
Planned completion: 2025-05-22

Error prevention and closing confirmed.

• Unpositioned
Improved...
Validation results: PASS
Impact review: Completed
MRB approves: Completed
NCR close: Approved
Other Organiser 2025-05-23 18:45

08 From single point correction to systematic relapse prevention

CP Control Plan Update Control Plan
PF PFMEA Supplementary expire mode
WI Operational guidance assembly request update
JIG Faultproof. Add positioning structure
TR Training Re-certification of personnel
SPC Process monitoring Add trend surveillance
AUD Level review Continuous inspection of execution
Sample validation (new bug-proof assembly) 34 Packs
Unqualified 0
NCR Status CLOSED
TC-NCR-2608-0059
2025-05-26 11:20

09 Overview of abnormal governance (other cases)

Mother Fragmentation NCR-0047 Type: Retroactive anomalies
Status: Closed
Module phase NCR-0052 Type: Structural deviation
Status: Closed
Terminal NCR-0064 Type: Electrical security
Status: Closed
Box door gap NCR-0073 Type: assembly deviation
Status: Closed
LIQUID FLOWS NCR-0102 Type: pipe installation
Status: Closed
NCR-0047: The material inspection found local cracks in the busbar, batches were isolated and returned to the supplier and updated the supplier control plan.

10 Closing requires evidence bags and access clearances.

Close Conditions

✓ NCR records are complete and immutable.
✓ MRB decision-making is mandated.
✓ CAPA has been implemented and validated.
✓ The impact range has been re-scanned.
✓ The subject of correction has already passed.
✓ Prevention measures are already in the system.
✓ No downstream exposure or recovery has been completed.
✓ All evidence is auditable.

Close the evidence bag

ISO 9001 NCR records • Unqualified controls and corrective measures
8D / RCA report :: Analysis of root and systemic causes
MSC / calibration of evidence :: Measuring effectiveness
PFMEA / Control Plan Risk and process control updates
Return/ Maintenance records :: Evidence of the disposition of the object
Repeat raw data • PASS is not an oral conclusion
Impact range scan :: Identification of non-exposure
CAPA validity validation :: Preventing the recurrence of similar problems

Competence and review

Role Responsibility Close Permissions
Inspector Checkout / Original Record None
Quality Engineer NCR analysis Recommendations
Manufacturing Eng. Correct implementation None
MRB Chair Decision-making on disposal Approved disposal
Quality Manager Final review NCR Closed