Integrated lithium battery energy storage solutions
Install and debug support | Installation & Commissioning Support

From site preparation to system acceptance,
Make every transmission clear and clear.

Tianchu provides Technical Support, which runs through the process of installing and debugging the system on site, from site preparation, equipment-to-carrying, interface inspection, to portal control, subsystem connection, performance validation and SAT, ensuring that the conditions for each stage are clear for the next phase through standardized inspections and traceable evidence.
SAFE
Security first.LOTO and PPE are prerequisites for all jobs
GATE
Close the ring under conditions.There are clear access conditions for every transmission phase.
EVD
Talk to the evidence.Recording, delivery and acceptance evidence throughout the process
REL
With system reliability.Cross-discipline coordination to support stable system operation

Our service range.

Coverage of the entire process from site preparation to system acceptance and handover

01
Stand by.
With confirmation of condition
02
Delivery of equipment
and acceptance
03
Position and interface
Inspection
04
Checking before sending a message.
Security confirmed.
05
Subsystem Debug
and authentication
06
System debugging
and Performance Authentication
07
SAT and handover
Information delivery
Stand by.
With confirmation of condition
02
Delivery of equipment
and acceptance
03
Position and interface
Inspection
04
Checking before sending a message.
Security confirmed.
05
Subsystem Debug
and authentication
06
System debugging
and Performance Authentication
07
SAT and handover
Information delivery

End-to-end installation and debugging methods

Standardized process + key control points + traceable evidence

01

On-site readiness and condition confirmed.

  • Construction interface confirmed
  • Basic and pre-burial inspection
  • Electricity and construction conditions confirmed
  • Safety zone and access inspection
02

Delivery and acceptance of equipment

  • Appearance and packing check for goods
  • Equipment model and quantity reconciliation
  • Transport incident and impact record
  • The arrival is abnormally closed.
03

In-situ and interface check

  • Equipment position and stationary check
  • High-pressure cable connection
  • Communications and ancillary systems interface
  • Local and mechanical connection confirmed.
04

Pre-charge check and security check.

  • LOTO execution and authentication
  • Insulation and ground inspection
  • Protect fixed values and lock confirmation
  • The terms of the transmission are signed.
05

Subsystem debugging and authentication

  • BMS / PCS / EMS Convergence
  • Thermal management and fire testing
  • Support system confirmation
  • Subsystem problem closed
06

System debugging and performance validation

  • Charge/Discharge Testing
  • Connect with the system
  • Power Response Validation
  • Protect Actions and Restore Authentication
07

SAT and handover of information

  • SAT Implementation and Witness
  • Closure and review
  • Archives of evidence and reports
  • Transport and Technology Documents Transfer

All-stop perspective: partition readiness and electrical door control

Gradually move towards a safe and controlled system for transmission of electricity with clear area-ready conditions and checkpoints

Construction and base areas

Basic strength, level, pre-filled, ground conditions met

Ready 8 / 8

Device position

Equipment position, spacing, height and fixed condition confirmed

Ready 10 / 10

One / two interface areas

Cable, communications, control and engineering interface checks completed

Ready 12 / 12

Auxiliary system area

Conditions met for liquid cooling, fire protection, auxiliary power, lighting and environmental systems

Ready 9 / 9

Debugging & Linkage

BMS / PCS / EMS / Fire Communal Equivalent System Validation

Ready 14 / 14

Connect and send door control

Transmission conditions, grid access licences and key protections were met

Status Ready

Key technical inspection and certification (selected)

Foundation and location

Base strength, horizontality, horizontal deviation; ground-based electrical resistance ≤ 0.5 (DEMO)

Cable and interface

Cable routing, bend radius, phase sequence; busbar and bolt-torque checks (DEMO)

Insulation and stress.

DC 1000V insulated electrical resistance 10M; AC depressure test (DEMO)

Protection and Interlock

Protect calibration, interlock logical check to confirm failure and restore condition

Performance and Response

≥90%; ≤500ms

Data debugging and visualization

Key curves and indicators form quantitative evidence before acceptance to ensure that the process can be resumed Nuclear

Power-Step Response (DEMO)

Delivery results and evidence kits

A complete set of retroactive debugging evidence to support acceptance and long-term viability

REC
Check and test recordsForms, data and signatures
RPT
Debug ReportProcesses, findings and conclusions
DATA
Curves and LogsRaw data and analysis
NCR
List of issues and closure recordsAlteration and validation of evidence
SAT
SAT Records and CertificatesWitness, signature and confirmation
O&M
Transport handover packageDocuments, parameters and Training information
Check and test records Forms, data and signatures
RPT
Debug Report Processes, findings and conclusions
DATA
Curves and Logs Raw data and analysis
NCR
List of issues and closure records Alteration and validation of evidence
SAT
SAT Records and Certificates Witness, signature and confirmation
O&M
Transport handover package Documents, parameters and Training information

Need installation and debugging support?

Our engineers can assist in the preparation, system delivery to SAT and the eventual handover, establishing a complete chain of conditions and evidence.