With four standard DC Blocks,
Construction of 20,256 MWh grid side energy field Station
DEMO PROJECT
TC-DEMO-PROJ-GS-20256
Total capacity
20.256MWh
Power
5MW / 5MVA
Grid-connection voltage
35kV
Status
COMMISSIONING
01 Total site plane and partition
02 5MW Power Link
03 35kV Access Point One System Chart Line Chart
04 AGC/AVC Coordinated Control Closed Loop Multiple Blocks
Network AGC/AVC command
→
EMS Calculation and Distribution
Block Optimizing Schedule
Block Optimizing Schedule
→
PCS Response Execution
Power Tracking
Power Tracking
Block 1
ONLINE
Modifiable 1,210 kW
SOC 52.3%
Temperature 28.1°C
Block 2
ONLINE
modifiable power 1,310 kW
SOC 51.8%
Temperature 25.7°C
Block 3
ONLINE
Modifiable 1,220 kW
SOC 51.8%
Temperature 26.4°C
Block 4
ONLINE
modifiable power 1,330 kW
SOC 51.6%
Temperature 26.0°C
Command and Response Curve (DEMO)
P-Q Capability Curve (35kV, 2.5MVA/PCS)
Quick Response (Step: 0-5 MW)
SOC Balance (4 Block)
Electrical Quality (netted points)
| Item | Actual |
|---|---|
| THD | 1.42% |
| THD | 1.78% |
| Power factor | 0.997 |
| Frequency deviation | ±0.01 Hz |
06 Block Segregation and Capability Operations Policy DEMO scene
Functioning (4/4)
Block 1
5.064MWh
Block 2
5.064MWh
Block 3
5.064MWh
Block 4
5.064MWh
Block 2 Fault isolation (3/4)
Block 1
Available
Block 2
segregated
Block 3
Available
Block 4
Available
Block 3 overhaul (3/4)
Block 1
Available
Block 2
Available
Block 3
Inspection
Block 4
Available
Single Block Supply (1/4)
Block 1
Available
Block 2
Fault
Block 3
Fault
Block 4
Fault
07 Project implementation process
Normal FAT
Transport
Reload.
Site installation
Debug
Networking
Protection and control
- PCS Multilayer Protection
- DC side relay protection
- AC Side Stream / Overpressure
- Fault classification
Measurement and settlement
- Double-direction measurement
- 0.2S level of electrical energy measurement
- Powerful / Powerless
- Day/ Month/Year Report
Surveillance and Communications (SCADA)
- Station control: EMS + SCADA
- Communication Protocols: IEC 61850
- Communications network: bicyclic fibre-optic
- Sample period: 100 ms
Time Sync
- GPS / Beidou time
- PTP(IEEE 1588v2)
- Time precision ≤ 1 ms
Single-electric protection cooperation
- Superior protection / Station protection
- Layer Action Time
- Protect Selective Authentication
08 Debug and connect Multi Block Unified Monitoring
Total Power (MW)
4.98
Current electricity (MWH)
3.46
Average SOC (%)
51.9
Mean temperature (°C)
26.2
| Block | Capacity | Status | Power | SOC | Temperature |
|---|---|---|---|---|---|
| Block 1 | 5.064MWh | ONLINE | 1.28MW | 52.3% | 26.1°C |
| Block 2 | 5.064MWh | ONLINE | 1.31MW | 51.8% | 25.7°C |
| Block 3 | 5.064MWh | ONLINE | 1.25MW | 52.0% | 26.4°C |
| Block 4 | 5.064MWh | ONLINE | 1.14MW | 51.6% | 25.8°C |
Event sequence record (SOE)
10:00:12
Interconnect the switch.
Berhasil
10:00:13
PCS Start
Berhasil
10:00:30
Network stability
&Normal
10:02:35
AGC Access
&Normal
10:03:10
5MW Command Tracking
&Normal
Problem closed loop (DEMO)
03-17
PCS start parameters
Low
Closed
03-17
Battery temperature differential
Medium
Closed
03-18
Communications dithering
Low
Closed
03-18
Station-controlled connection optimization
Low
Closed
20.256 MWh grid side energy field Station
Stability... efficiency... intelligence... trust.
TIANCHU has the engineering capacity to assist in the high-quality development of the grid side storage.