Size of assets (example)
Project level BESS
Capacity by project programme| Services | Basic support Essential | Enhanced support Advanced | Advanced support Premium | Engineering support Engineering |
|---|---|---|---|---|
| Remote monitoring and alarm management | ● | ● | ● | ● |
| Remote response and trouble management | ● | ● | ● | ● |
| Preeventive Maintenance / Periodic Inspection | ● | ● | ● | ● |
| Health monitoring of key components | — | ● | ● | ● |
| Battery health assessment and life expectancy | — | ● | ● | ● |
| Performance optimization and strategy debugging | — | ● | ● | ● |
| Spare parts security and management | — | — | ● | ● |
| Project | — | — | ● | ● |
| Upgrading and extension programmes | — | — | ● | ● |
| Annual health report | — | ● | ● | ● |
| KPI Performance Assessment and Improvement | — | — | ● | ● |
Key / Critical / General spare parts hierarchy management, with inventory configured according to risk and delivery cycle.
High-frequency maintenance components are tiered with fail-safe components to increase the recovery rate on site.
Dynamic adjustments to spare parts stocks and priorities based on health and failure trends.
Regional warehouses work with the field to increase efficiency in the allocation of critical spare parts.
Retrospect the life cycle of spare parts, from warehousing, access to replacement, and retrospect.
| KPI Indicators | Definitions | Target value (example) | Frequency of assessment |
|---|---|---|---|
| Availability (A) | Actual / Total Time Available | ≥ 98.5% | Month |
| Number of critical malfunctions | Cumulative breakdown/ annual running | Keep it down. | Month |
| System Efficiency (RTE) | Recharge / Charge Energy | ≥ 86% | Month |
| Alarm handling timeliness | Close the ring on time. | ≥ 95% | Month |
| Plan to maintain a closed circle rate | Complete maintenance project / plan maintenance item | ≥ 95% | Quarterly |
| Client satisfaction | Client annual rating | 90 minutes | Year |
From shipping, maintenance, health assessment to upgrading, a verifiable and optimized service closed loop is established.