Integrated lithium battery energy storage solutions
Engineering Consulting | Engineering Consulting

On-site conditions, system interfaces and
Operational objectives, translated into implementable
Engineering decisions

Focusing on Engineering Consulting and Technical Decision Support in large-scale BESS projects to form verifiable engineering judgements from real sites, system boundaries, operational objectives and project constraints. This page focuses on Engineering Consulting and Decision-Making and does not serve as an equipment sales or product selection page.

Our Engineering Consulting Process

IN
Project Input ReviewList of objectives, constraints and basic inputs
IFC
Field and interface boundary confirmationSites, interfaces and liability boundaries
RISK
Risk identification and assessmentHAZID / HAZOP / Risk evaluation
CMP
Programme comparison and quantitative assessmentTechnology, economy and enforceability
ACT
Project proposal and course of implementationPhased strategy and interface recommendations
REC
Decision-making records and traceabilityBasis for decision-making and evaluation of results

Large BESS Engineering Consulting Key Perspectives: from a constraints perspective, the development of an implementable decision matrix

We've consolidated the decentralized input conditions into a verifiable bound map, and we've made engineering suggestions around the architecture and implementation strategy.

Electrical interconnection conditions

  • POC capacity and short-circuit capacity
  • Voltage level and protection requirements
  • Grid-connection codes

Load and operating targets

  • Peak-valley arbitrage / frequency regulation / backup needs
  • Charge/discharge strategy and energy targets
  • Availability and lifetime goals

Communications and monitoring

  • Dispatch communications and protocol requirements
  • Cybersecurity and isolation requirements
  • Data point lists and interfaces

Lifecycle and O&M

  • Life cycle costs (LCC)
  • O&M resources and spare-parts strategy
  • Decommissioning and recycling requirements

Sites and civil facilities

  • Available area and layout boundary
  • Endurance / Mark / Drain
  • Road and site construction

Climate and environmental conditions

  • Extreme temperature / humidity / altitude
  • Wind / Dust / Salt mist / Thunder
  • Seismic intensity requirements

Fire and emergency routes

  • Fire water and stress
  • Fire spacing and evacuation path
  • Availability of emergency relief

Logistics and construction conditions

  • Transport load and turn radius
  • Hanging radius and equipment transport
  • Construction windows and seasonal impacts
Binding integration and authentication Conflict identification and prioritization Multidisciplinary proofing Phase engineering judgement

• Action matrix Example:

Constraints Key indicators / requirements Current status Risk level Engineering decision/action Responsible party Target completion time
Networked short-circuit capacity ≥ 25 GVA 18.7 GVA High Add 110 kV pressure transformer to optimize grid access Points Owner / Network Company T + 30 days
Available area ≥ 120m × 80m 110m × 72m Medium Optimization of deployment, adoption of compact schemes, pre-positioning of transportation routes Engineering Consulting / Design Institute T + 21 days
Fire access route ≥6m loop channel Local 4m High Reconfigure the whole plane and reset the fire escape. Engineering Consulting / EPC T + 14 days
High ambient temperature 35°C Design temperature 40.6°C(P90) Medium Adjustment of thermal management system to increase the heat design abundance Engineering Consulting T + 14 days
Communication links Double-link redundancy Single link Medium Add a new communications backup link, configure the LTE backup chain Owner / Communications Service T + 21 days

Programme versus quantitative decision-making

ProgrammeOption A Exchange couplingOption B: DC couplingOption C Mixed coupling
Available capacity100 MW100 MW100 MW
System Efficiency (RTE)87.1%89.6%88.3%
CAPEX (thousands)41,20044,60042,800
Land area (m2)9,6009,2009,450
Construction cycle7.5 months8.0 months7.0 months
Transport complexityMediumMediumMedium High
Comprehensive rating (weighted)★★★☆☆★★★★☆★★★★☆

Interface boundaries and delineation of responsibilities Example:

List of typical interfaces

Interface categoryInterface NameInterface DescriptionInterface PointResponsible party (recommendation)
Electrical interfaceGrid-connected interface35kV Switch Cable AccessSwitch the counter out of the line.Owner / Network Company
Electrical interfaceSecondary powerAC 380/220V, 50HzA low-pressure cabinet.EPC
Communications interfaceDispatch communicationsIEC 104 / 101Combination cabinetOwner/ Communications Unit
Communications interfaceSite NetworkEthernet (MMS)Industrial exchangesEPC
Fire interfaceFire fighting.Fire alarm, contact control.Fire control cabinetEPC
Civil interfaceFoundation and locationEquipment base, grounding outBase Ground EndEPC
Drainage interfaceField drainageLower drainage and ditches.Intersection PointEPC

Risk identification and response Example risk register

Risk ID Risk description Reason Impact Possible Risk level Response Head
R-01 Inadequate grid access Delay in grid planning Project extensions High High Forward communication with grid company, pre-positioning the expansion programme Consultants
R-02 Fire escape is not satisfactory. Limited site I can't get through. Medium High Optimizing the master chart and increasing the ring channel Consultants
R-03 High temperatures cause drops Extremely high temperature Reduced availability Medium Medium Optimizing heat management by selecting environmentally compatible devices Consultants
R-04 Single-point failure of communication links Communications company lines Dispatch aborted Medium Medium Double-link redundancy + back-up links Consultants
R-05 Logistics constraints Inadequate road width Delays in the shipment of equipment Low Medium Construction window and transport programme adjustments Consultants

On the ground, the evidence chain. Example:

Site status (Northern perspective)Available area approximately 7.9 ha
Landmarks and drainageLowest Point Mark Around -1.2m
Fire escapes are measured.Local net width approximately 4.2 m
Transport road and turn radiusTurn radius approximately 12.5 m
Access point site survey35kV switch station
Site status (Northern perspective) Available area approximately 7.9 ha
Landmarks and drainage Lowest Point Mark Around -1.2m
Fire escapes are measured. Local net width approximately 4.2 m
Transport road and turn radius Turn radius approximately 12.5 m
Access point site survey 35kV switch station

List of engineering deliverables Selected

01
Advisory baseline reportList of project information, constraints and inputs
02
Binding maps and action matricesConflict Identification and Operations List
03
Interface list and liability boundaryInterface definition and liability recommendations
04
Programme comparison and evaluation reportsMulti-dimensional quantitative assessment and recommendations
05
Risk register and response planRisk evaluation and response
06
Decision-making records and road map for implementationBasis for decision-making and milestones plan
Advisory baseline report List of project information, constraints and inputs
02
Binding maps and action matrices Conflict Identification and Operations List
03
Interface list and liability boundary Interface definition and liability recommendations
04
Programme comparison and evaluation reports Multi-dimensional quantitative assessment and recommendations
05
Risk register and response plan Risk evaluation and response
06
Decision-making records and road map for implementation Basis for decision-making and milestones plan

Need to do Engineering Consulting on your BESS project?

We will help you to make enforceable, reviewable and retroactive project decisions, based on conditions on the ground and project constraints.

Scope of consultationProject levelBESS
OutputProgramme and boundaryReview
Applicable sizeBy SiteMW / Item