Integrated lithium battery energy storage solutions
Remote Technical Support | Remote Technical Support

Connect onsite operators with multidisciplinary experts,
ShareSame one.Evidence of equipment status and disposal

Large BESS Specialist Remote Support Service

When equipment anomalies occur at the site, a multidisciplinary team of experts from the Planet and your operators, based on the same set of real-time data and evidence, quickly judge, decide together, verify the closed loop, so that every disposal can be documented.

EXP
Multidisciplinary synergy Electrical / Battery / Thermal Management
ENG
Engineering Remote Input Based on equipment and situation on site
EVD
Controlled Command Level approval and operation
CLS
Closering Authentication Comparable before and after implementation

Standard process from request to closed loop

01
Request admissibleRequest for support on site
02
Identity and scene confirmation.Personnel / Site / Device check
03
Evidence package constructionData / Log / Picture / Popup
04
Remote consultationsJoint multidisciplinary analysis
05
Disposal programme confirmationControlled command and risk confirmation
06
Implementation and real-time validationProcess Synchronization and Results Validation
07
Close and ArchiveDeposition cases and optimization experience

Timeline for the same event . Double-screen sync

Field operators and experts see the same event views, data and evidence, making decisions more consistent and efficient.

Field Operator View
Remote expert view
Event: PCS Station Control Temperature AlertTime: 2025-05-20 10:24:17
Equipment: BESS-01/PCS-02
BMS ExpertsBatteries and control
PCS ExpertElectricity and electronics
EMS ExpertEnergy Management
Heat management specialistLiquid cooling and dissipation
Fire expertFire and safety

Security session boundary. Data is out of bounds.

Support for on-site data security compliance in accordance with the minimum privileges and controlled remotes principle.

MFA
Multifactor CertificationDouble verification of personnel status
ACL
Minimum PermissionsAccess and operation restricted on demand
TLS
Encrypted secure channelTLS 1.3 / Data controlled
CTRL
Operation controlledWe need a live confirmation.
AUD
Full auditTraceable Timeline

Evidence-driven diagnosis.

Multi-source evidence automatically linked, fast-track problem nature.

Key Operating Data (DEMO)

Battery voltage832.4 V
Battery voltage-125.6 A
SOC62%
Maximum Temperature41.8 °C
PCS Output Power-1.25 MW
DC bus voltage1332 V

Temperature Trends (°C)

Event Sequence (DEMO)

10:24:17PCS-02 Passing the Warm Alert
10:24:18The wind is rising.
10:24:21Automatic reduction of power
10:24:35DC output remains stable
10:25:02Access restricted mode

Real-time measurement comparisons

Parameters
Live
Experts
Δ
DC bus voltage
1332 V
1331 V
Δ1V
PCS Temperature T1
41.8°C
41.7°C
0.1°C
Ambient temperature
28.6°C
28.6°C
0°C
Fan speed
2560
2560
0rpm

Controlled orders. Risk-controlled engineering decisions.

The disposal programme was evaluated and confirmed at multiple levels to facilitate control of the implementation process.

Multi-dimensional conclusions

PCS-02 Thermal vents are partially blocked, resulting in the temperature of the module, and it is recommended to clear the tunnel and check the wind engine.

Severity: high

Disposal programme

  1. Limit Current Load
  2. Isolation of the bypass.
  3. Check windways and filter components
  4. Restore and gradually lift authentication

Risk level:Medium

Experts confirm

PCS ExpertZhang ✓
Heat management specialistLi Xiao. ✓
Security specialistsWang Man. ✓

Operation Authorization

Head of the scene.Manager Zhao ✓
Client representativesChen Jia. ✓

Mandated:10:28:11

Execute Directive (example)

Please implement as step 2:

Cleaning of the heat-dispersion channels, taking photographs and measuring the speed of wind turbines after completion.

Implementation and real-time validation

Implementation process and results, processing comparison and validation of effects.

10.30 Cleaning of filtered windways (completed)

PCS Temperature (°C)

Wind rotation (rpm)

PCS Output Power (MW)

Close and archive

This Remote Support process is fully documented, resulting in reusable knowledge assets.

Case No.RS-20250520-PCS02
EquipmentBESS-01 / PCS-02
Event TypeI'm warning you.
Time of occurrence2025-05-20 10:24:17
Close Time2025-05-20 10:47:36
Process length23 min

Gene.

Wind-inward filtration components are partially dusted, leading to reduced wind volume and to modular warming.

Suggested improvements

  1. Increase the frequency of filtering
  2. Optimizing wind velocity associated with temperature warning

Annex evidence (extract)

Live photos
Twelve.
Trends
Six.
Log File
Three.
Video Snippet
Two.

Technical Support? We can work together on service agreements.

Whether it is warning disposal, failure diagnosis or operational optimization, the technical team can provide remote and in situ synergy support based on the range of services.

Response by service agreement